CADDX NX-6 Manuel d'installation Page 55

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 104
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 54
GE Security
g
LOCATION 47 - AUXILIARY OUTPUT 1, EVENT AND TIME (2 segments, numerical data)
Segment 1 Use the chart below to select the event that will activate auxiliary
output 1 (relay 1)
Segment 2 Program the timing from 0-255 (minutes or seconds, depending on the
data programmed in segment 1, location 46). Programming a “0”
makes the output follow the event
LOCATION 48 - AUXILIARY OUTPUT 2, EVENT AND TIME (2 segments, numerical data)
Segment 1 Use the chart below to select the event that will activate auxiliary
output 2 (relay 2)
Segment 2 Program the timing from 0-255 (minutes or seconds, depending on the
data programmed in segment 2, location 46). Programming a “0”
makes the output follow the event
LOCATION 49- AUXILIARY OUTPUT 3, EVENT AND TIME (2 segments, numerical data)
Segment 1 Use the chart below to select the event that will activate auxiliary
output 3
Segment 2 Program the timing from 0-255 (minutes or seconds, depending on the
data programmed in segment 3, location 46). Programming a “0”
makes the output follow the event
LOCATION 50- AUXILIARY OUTPUT 4, EVENT AND TIME (2 segments, numerical data)
Segment 1 Use the chart below to select the event that will activate auxiliary
output 4
Segment 2 Program the timing from 0-255 (minutes or seconds, depending on the
data programmed in segment 4, location 46). Programming a “0”
makes the output follow the event
NX-6-EUR Installation manual Page 55 23/12/04
Vue de la page 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 103 104

Commentaires sur ces manuels

Pas de commentaire